Part I: installing access tubes
Wednesday, August 25, 2010
Soil water content probes installed!
Part I: installing access tubes
Tuesday, August 24, 2010
Working hard
Thursday, August 19, 2010
Before installation? Configuration!
The configuration process
Configuring the soil water content probes consists of establishing, for each indiviual sensor:
-high and low points
-depth in the ground
-poistion on the probe
-sampling interval
The final step is naming the specific probe based on study necessity.
Below are pictured all the tools for successful configuration of these particular probes (Solo).
For configuration to begin, the probe is connected to the head unit (for power) and the USB cable (to communicate with the laptop).
Once communication is achieved, the probe is then inserted into the access tube. The tube is then held in the air and each sensor is read individually to establish the high point reading.
Monday, August 16, 2010
C-111 Project wells are now operational!*
Surveying
Leveloggers
The final step in the process involved the programming and deploying of Solinst leveloggers. The leveloggers were installed at an elevation of -2 meters below sea level (NGVD 29) and were programmed to log water table levels every 15 minutes. A barologger was installed in one of the wells in order to provide for atmospheric corrections. The leveloggers are currently in a testing period.
Soil Water Monitoring
In the coming weeks, we will install EnviroScan probes near the well locations to monitor soil water in the different soil types (i.e., Krome, Chekika and Marl) of the agricultural areas along the C-111 canal. Stay tuned!
* Isaya Kisekka contributed to this blog post.
Wednesday, August 11, 2010
Great team work
Monday, August 9, 2010
New video online - irrigation retrofit benefits!
The video is a short slideshow with narration originally produced for use on the FYN/UCU facebook page. However, despite conforming to size and length restrictions, it was rejected by the site. This version is full-HD.
Check it out!